Mission 29
STS-30R
1989-033A
Crew: 5 CDR - David M. Walker
Plt - Ronald J. Grabe
MS 1 - Mark C. Lee (EV 2)
MS 2 - Norman E. Thagard (EV 1)
MS 3 - Mary L. Cleave
Launch 4 May 1989 @ 1446:59.0682 EDT
Orbital incl: 28.89
Max alt: 331.5 km.
Orbits: 64
Dur: 4:00:57:27
Landing: 8 May 1989 @ 1243:26 PDT
Launch Info: Orbiter - Atlantis 104-4 Pad 39B KSC (MLP-1) - Hold time of 59
minutes due to SLF wind conditions for at RTLS abort at T-5 minutes. First attempt on
28 April scrubbed at T-31 seconds due to hydrogen recirculation pump failure (after
40 minutes of hold). Landed on concrete runway 22 Edwards AFB (With 16 knot
crosswind landing accomplished.) Note: Runway changed at last minute from 17 to 22
due to cross winds.

MISSION PARTICULARS
Launch Window: 1 hour, 4 minutes (1:48 - 2:52 pm EST)
Planetary window for Magellan: 31 days, 28 April - 28 May 1989
TAL Sites: Ben Guerir (alternate Moron), contingency in-plane abort: Banjul, alternate: Bermuda
AOA site: Edwards AFB (alternate WS and KSC)
Primary landing site: Edwards AFB
Landing Speed: 196 knots (225 mph)
Landing rollout: 10,295' from main gear touchdown
Vehicle weight @ liftoff: 4,536,344 lbs
Orbiter weight @ liftoff: 261,118 lbs
Orbiter weight @ landing: 192,459 lbs
PAYLOADS
Cargo mass approx.: 47,909 lbs
Landing Weight: 7,701 lbs
Special mission kits: EMU's 1096, 1095, Galley, TAGS, Teleprinter, no RMS
PRIMARY PAYLOADS
Magellan Venus Probe/IUS-#18 - 1989-033B Deployed mass - 45,799 lbs. Probe mass - 7,383 lbs
SECONDARY PAYLOADS
Mid-deck FEA-2 (Floating Zone Crystal Growth and Purification), MLE (see STS-26), AMOS (see STS-29).
SHUTTLE STACK COMPONENTS
SSME's: 2027 (1), 2030 (2), & 2029 (3) - All 2nd use. At Tower Clear 104%
OMS Pods/Engines: LP-99/106 - Pod 9th use, Motor 10th use & RP-99/111 - Pod 9th use, Motor 5th use
ET: ET-29 (LWT-22)
SRB's: BI-027 (RSRM-4) - Set successfully recovered, No. 2 LH SRB chute collapsed after infation
SHUTTLE STACK COMPONENTS
Left - 27A Right - 27B
New ? Fwd ? ?
? ? Cyl ? 21
ETM1 ? Cyl ? New
? ? Cyl ? ?
New ? Cyl ? New
New ? Cyl ? ?
? ? Cyl ? Q6
? ? Att ? D9
ETM1 ? Stf ? ?
ETM1 ? Stf ? ?
? ? Aft ? ?
Magellan Venus Probe Deploy
MISSION MILESTONES:
12 December 1985 ET-29 arrives on dock KSC
14 December 1988 OV-104 returns to the OPF following Mission-27
2 March 1989 ET/SRB mate
11 March 1989 OV-104 rollover from OPF-2 to VAB High Bay 3 for stacking the following day
22 March 1989 Stack rollout to Pad 39B
25 March 1989 Magellan payload loaded aboard Atlantis at Pad 39B
7 Apri l 1989 TCDT dress rehearsal conducted with crew aboard orbiter
1 May 1989 Astronaut arrival KSC. Also the hydrogen recirculation pump/line were replaced on Atlantis
2 May 1989 "Call to stations" 43 hr countdown started at 8 am EDT
4 May 1989 Launch
8 May 1989 Landing at Edwards AFB
13 May 1989 First leg of ferry flight from Edwards AFB to Briggs Army Air Base, El Paso for an overnight stay
15 May 1989 Final leg from Biggs AAB to Dallas/Ft. Worth Int. Airport to Warner Robins AFB to KSC OPF-2 (one day hop)
10 August 1990 Venus Orbit insertion for Magellan
?? October 1994? Magellan re-enters Venus' atmosphere
pre-shuttle missions. shuttle era missions.
Table of Contents Shuttle Missions Main