Mission 58
STS-58
1993-065A
Crew: 7 CDR - John E. Blaha
Plt - Richard A. Searfoss
MS 1 - M. Rhea Seddon (PLC)
MS 2 - William S. McArthur
MS 3 - David A. Wolf (EV 2)
MS 4 - Shannon W. Lucid (EV 1)
PS 1 - Martin J. Fettman
Launch 18 October 1993 @ 1053:10 EDT
Orbital incl: 39.02
Max alt: 289.7 km.
Orbits: 225
Dur: 14:00:12:32
Landing: 1 November 1993 @ 0705:42 PST
Launch Info:
Orbiter - Columbia 102-15 Pad 39B KSC (MLP-1) - First attempt on 14 October was
scrubbed at T-30 seconds due to failed RLS console. Second attempt on 15 October
was scrubbed at T-9 minutes due to communications failure and weather at KSC.
Landed on concrete runway 22, Edwards AFB. Longest shuttle mission to date, and
fourth longest US spaceflight to date.

MISSION PARTICULARS
Launch Window: 2 hours, 24 minutes (10:53 am - 1:17 pm EDT)
TAL Sites: Ben Guerir, Morocco (Alternative: Moron and Zaragoza)
AOA site: Edwards AFB (Atlernates: KSC and WS)
Primary landing site: Edwards AFB (Scheduled: 7:22 am PST)
Landing Speed: To be determined
Landing rollout: 9,640' from main gear touchdown
Vehicle weight @ liftoff: 4,519,968 lbs
Orbiter weight @ liftoff: 256,007 lbs
Orbiter weight @ landing: 229,753 lbs
PAYLOADS
Cargo mass approx.: 23,188 lbs
Landing Weight: Same
Special mission kits: Two EMU's, SORG Galley, teleprinter, TAGS, Sleeping bags (no berths), MAR, Regenerative CO2, MADS, exercycle, five laptops, six Generic Stowage containers, standard WCS & no RMS
PRIMARY PAYLOADS
Spacelab Life Sciences-2 - Long module/Unit-2 & Tunnel 14 expirements. Mass - 21,840 lbs
EDO - Extended Duration Orbiter On pallet. Mass - 3,588 lbs
SECONDARY PAYLOADS
Mid-deck SAREX-II Config. C Call signs: Searfoss - license pending, McArthur - KC5ACR & Fettman - KC5AXA. Also - Pilot Inflight Landing Operations Trainer (PILOT) landing simulator (DTO-0667), Orbital Acceleration Research Exp. (OARE) (DTO-0910), and 'Principle Investigator-in-a-box' knowledge-based system to help run exp's, also known as 'Astronaut Science Advisor' uses a Powerbook computer.
SHUTTLE STACK COMPONENTS
SSME's: 2024 (1) - 7th use, 2109 (2) & 2018 (3) - Both 11th use. At Tower Clear 104%
OMS Pods/Engines: LP-05/115 & RP-05/116 - all 4th use
ET: ET-57 (LWT-50) with AADS, final flight
SRB's: BI-061 (RSRM-34) - Set successfully recovered.
SHUTTLE STACK COMPONENTS
For a complete listing, see the Shuttle Rocket Booster page

Spacelab Life Sciences-2
MISSION MILESTONES:
24 March 1993 ET-57 arrives on dock KSC
14 May 1993 OV-102 returns to OPF-2 following Mission-55/STS-55
16 July 1993 Spacelab & EDO payload installed into the orbiter while in the OPF
21 July 1993 ET-57/SRB mate in VAB High Bay
12 August 1993 OV-102 rollover from OPF-2 to VAB High Bay for stacking the same day
16-17 September 1993 Stack rollout to Pad 39B (exited VAB at 10:57 pm EDT)
21 September 1993 TCDT countdown dress rehearsal conducted with crew aboard
11 October 1993 "Call to stations" 43 hr countdown started at 12 am EDT and astronaut arrival at KSC
18 October 1993 Launch
1 November 1993 Landing at Edwards AFB (planned)
7 November 1993 First leg of ferry flight from EAFB to Columbus AFB for overnight stay utilizing SCA-911
8 November 1993 Final leg of ferry flight from Columbus AFB to KSC/SLF & OV-102 returning to OPF-2 the next day
pre-shuttle missions. shuttle era missions.
Table of Contents Shuttle Missions Main