Mission 32
STS-33R
1989-090A
Crew: 5 CDR - Frederick D. Gregory
Plt - John E. Blaha
MS 1 - Manley L. Carter (EV 1)
MS 2 - F. Story Musgrave
MS 3 - Kathryn C. Thornton (EV 2)
Launch 22 November 1989 @ 1923:29.986 EST
Orbital incl: 28.47
Max alt: 560.1 km.
Orbits: 78
Dur: 5:00:06:48
Landing: 27 November 1989 @ 1630:16 PST
Launch Info: Orbiter - Discovery 103-9 Pad 39B KSC (MLP-2) - Hold time of
1 minute, 30 seconds at T-5 minutes due to pressurization system adjustment. Third night
launch. Landed on concrete runway 04 Edwards AFB. One day waveoff on 26 Novem-
ber due to crosswinds. One orbit waveoff due to wind gusts - was scheduled at 2:52 pm.
Runway switched at last minute from 22 to 04.

MISSION PARTICULARS
Launch Window: DOD announced period: 6:30 - 10:30 pm EST (actual 1 hour, 10 minutes: 7:22 - 8:32 pm)
TAL Sites: Ben Guerir
AOA site: Edwards AFB
Primary landing site: Edwards AFB, scheduled 7:02 pm EST 26 November
Landing Speed: 199 knots (229 mph)
Landing rollout: 7,764' from main gear touchdown
Vehicle weight @ liftoff: 4,529,160 lbs
Orbiter weight @ liftoff: 194,282 lbs (without cargo)
Orbiter weight @ landing: N/A
PAYLOADS
Cargo mass approx.: 45,737 lbs
Landing Weight: 7,249 lbs
Special mission kits: EMU's 2006 & 2005, Galley, teleprinter, no RMS
PRIMARY PAYLOADS
DOD-03, Magnum Signal Intelligence Satellite/IUS - 1989-090B Deployed mass - 38,488 lbs (Magnum mass - 5,985 lbs). Reported deployed at 6:15 am EST on Rev. 7
SECONDARY PAYLOADS
Cargo Bay AMOS (see STS-29R), APE-B (see STS-9), CLOUDS-1A (see STS-14/41D), RME-III (see STS-8), and VFT-1 (see STS-44)
SHUTTLE STACK COMPONENTS
SSME's: 2011 (1) - 4th use, 2031 (2) - 2nd use, 2107 (3) - 6th use. At Tower Clear 104%
OMS Pods/Engines: LP-04/109 - Pod 6th use, Motor 3rd use & RP-01/111 - Pod 2nd use, Motor 6th use
ET: ET-38 (LWT-31)
SRB's: BI-034 (RSRM-7) - Set successfully recovered
SHUTTLE STACK COMPONENTS
Left - 34A Right - 34B
PVM1 034 Fwd 039 26
22 022 Cyl 017 Q-7
New 017n Cyl 005n Q-7
24 L74 Cyl L84 19
New L45n Cyl L43n New
19 L80 Cyl L96 22
New L40n Cyl L42n New
26 L30 Att L31 26
New L56 Stf L29 TEM1
26 L47 Stf L30 TEM1
26 046 Aft 008 D-7
Fifth DOD Mission
MISSION MILESTONES:
6 March 1989 ET-38 arrives on dock KSC
24 March 1989 OV-103 returns to the OPF following Mission-28/STS-29R
10 July 1989 OV-103 rollover from OMRF (temporary storage) to OPF-1 to begin processing for STS-33
23 September 1989 ET/SRB mate
6 October 1989 OV-103 rollover from OPF-1 to VAB High Bay 3 for stacking same day (using Vandenberg transporter)
26 October 1989 Stack rollout to Pad 39B
30 October 1989 TCDT dress rehearsal conducted with crew aboard orbiter
19 November 1989 Astronaut arrival KSC, "Call to stations" 43 hr countdown started at 4 pm EST
22 November 1989 Launch
27 November 1989 Landing at Edwards AFB
3 December 1989 First leg of ferry flight from Edwards AFB to Sheppard AFB to Eglin AFB for an overnight stay
4 December 1989 Final leg of ferry flight from Eglin AFB to KSC and delivery to OPF-2
pre-shuttle missions. shuttle era missions.
Table of Contents Shuttle Missions Main