Mission 24
STS-32/61-C
1986-003A
Crew: 7 CDR - Robert L. Gibson
Plt - Charles F. Bolden
MS 1 - George D. Nelson (EV 1)
MS 2 - Steven A. Hawley
MS 3 - Franklin R. Chang-Diaz (EV 2)
PS 1 - Robert J. Cenker
PS 2 - Rep. C. William Nelson
Launch 12 January 1986 @ 0655:00 EST
Orbital incl: 28.47
Max alt: 346.0 km.
Orbits: 97
Dur: 6:02:03:51
Landing: 18 January 1986 @ 0558:51 PST
Launch Info: Orbiter - Columbia 102-7 Pad 39A KSC (MLP-1) - First launch
attempt on 17 December 1985 delayed to 19 December due to launch crew falling
behind schedule, 19 December attempt scrubbed at T-14 seconds due to SRB HPU
overspeed. Second attempt on 6 January 1986 - First cutoff at T-31 seconds due to
chilled LOX lines, 2nd cutoff at T-5 minutes after problem with LOX drainback during
recycle. Third attempt on 7 January scrubbed at T-9 minutes due to overcast at TAL site.
On 8 January a one day delay was ordered, due to MPS duct inspection. Fourth attempt
on 10 January scrubbed at T-9 minutes due to rain and bad weather at both TAL sites.
Landed on concrete runway 22 Edwards AFB (Second night landing). Landing was
rescheduled from 17 January to the 16th to save turnaround time at KSC, scrubbed due
to bad weather. 17 January landing sdcrubbed due to weather at KSC, delayed 24 hours.
18 January landing scrubbed due to bad weather and was retargeted to Edwards AFB.
A delay of one orbit was required to reach new site.

MISSION PARTICULARS
Launch Window: 1 hour, 4 minutes (6:55 - 7:59 am EST)
TAL Sites: Dakar
AOA site: Edwards AFB
Primary landing site: KSC.SLF, scheduled at 7:09 am EST, 17 January
Landing Speed: 217 knots (249 mph)
Landing rollout: 10,202' from main gear touchdown
Vehicle weight @ liftoff: 4,509,360 lbs
Orbiter weight @ liftoff: 256,003 lbs
Orbiter weight @ landing: 210,161 lbs
PAYLOADS
Cargo mass approx.: 32,462 lbs
Landing Weight: 20,111 lbs
Special mission kits: EMU's 1078 & 1081, Galley, teleprinter, HUD, no RMS
PRIMARY PAYLOADS
RCA-Model 4000 Satcom Ku-1/PAM-D2 #2 - 1986-003B Deployed mass - 12,351 lbs, ASE II Cradle. Satcom-Ku-1 mass - 2,251 lbs
MSL-2 Materials Science Laboratory - 3 experiments, MPESS carrier 1) EML (Electro-Magnetic Levitator), 2) ADSF (Automated Directional Solidification Furnace), 3) 3AAL (Three-Axis Acoustic Levitator)
GAS Bridge - 5,349 lbs (12 GAS Cans/Special Carrier) 1) G-0007, 2) G-0062, 3) G-0310, 4) G-0332, 5) G-0446, 6) G-0449, 7) G-0462, 8) G-0463, 9) G-0464, 10) G-0470, 11) G-0481, 12) G-0494 and 13) Unnumbered - EMP (Enviromental Monitoring Package - to monitor the environment of the GAS Bridge Assembly)
SECONDARY PAYLOADS
Mid-deck IR-IE (RCA Infared Imaging Exp. - modified Payload Bay TV Camera), PCG (see STS-51D), IBSE (Initial Blood STorage Exp.), CHAMP (Comet Halley Active Monitoring Program - 35 mm camera using image intensifier), Hitchhiker - G1 - PACS (STP S85-4, Particle Analysis Camera fo rShuttle), CPL (Capillary Pump Loop), SEECM (Shuttle Environment Effects of Coated Mirrors)
SSIP - 3 expirements SE83-6, SE83-4 & SE82-19
OEX ACIP (see STS-6), SILTS (Shuttle Infared Leeside Temperature Sensing System), SEADS (Shuttle Entry Air Data System) and SUMS (Shuttle Upper Atmosphere Mass Spectrometer)
SHUTTLE STACK COMPONENTS
SSME's: 2015 (1) - 5th use, 2018 (2) - 8th use, 2109 (3) - 9th use. At liftoff 104% and same after throttle-up
OMS Pods/Engines: LP-03/110 - 3rd use & RP-04/113 - 3rd use
ET: ET-30 (LWT-23), First ET to carry AADS (Ascent Air Data System)
SRB's: LO-24/BI-024 - Lightweight set successfully recovered
SHUTTLE STACK COMPONENTS
Left - 24A Right - 24B
14-B 025 Fwd 034 New
14-B 019 Cyl 014 14-A
14-B 018 Cyl 014 14-A
11-A L43 Cyl L73 14-B
14-A L72 Cyl L74 14-B
14-A L67 Cyl L69 14-B
14-A L70 Cyl L71 14-B
14-A L13 Att L14 14-B
14-A L23 Stf L11 14-B
14-A L24 Stf L40 New
14-A 013 Aft 025 14-B
Return of Columbia to Fleet
MISSION MILESTONES:
18 December 1983 OV-102 returns to the OPF following STS-9
26 January 1984 OV-102/SCA ferry flight from KSC to Kelly AFB fo rovernight stay, on way to Palmdale for overhaul
27 January 1984 Final leg of ferry flight to Edwards AFB
30 Janaury 1984 Overland transport of OV-102 from Edwards AFB to Rockwell Plant 42 for "mini-mods" overhaul
8 July 1985 ET-30 arrives on dock KSC
11 July 1985 Overland transport of OV-102 from Rockwell Plant to Edwards AFB for return to KSC
14 July 1985 Ferry flight from Edwards to Offutt AFB for refuelling stop and on to KSC one day hop
16 July 1985 OV-102 towed from SLF to VAB transfer aisle to await space in the OPF
18 July 1985 Rollover to OPF-2 from VAB
8 September 1985 Rollover from OPF-2 to VAB transfer aisle for temporary storage
26 September 1985 Rollover from VAB to OPF-2 for final preparations for Mission-24/61-C
15 November 1985 ET/SRB mate & installation of GAS Bridge and MSL into Columbia while in the OPF
22 Novmeber 1985 OV-102 rollover from OPF-2 to VAB High Bay 1 for stacking same day
1 December 1985 Stack rollout to Pad 39A
3 December 1985 Satcom Ku-1 installation into Columbia cargo bay while on Pad 39A
4 December 1985 TCDT dress rehearsal conducted with crew aboard orbiter
3 January 1986 Astronaut arrival KSC
4 January 1986 "Call to stations" 43 hr countdown started at 1 am EST
12 January 1986 Launch
18 January 1986 Landing at Edwards AFB
22 January 1986 First leg of ferry flight from Edwards AFB to Davis-Monthan AFB on to Kelly AFB for an overnight stay
23 January 1986 Final leg of ferry flight from Kelly AFB to KSC and dleivery to OPF Bay 1
pre-shuttle missions. shuttle era missions.
Table of Contents Shuttle Missions Main