Mission 5
STS-5
1982-110A
Crew: 4 CDR - Vance D. Brand
Plt - Robert F. Overmyer
MS 1 - Joseph P. Allen (EV-2)
MS 2 - William B. Lenoir (EV-1)
Launch 11 November 1982 @ 0718:59.997 EST
Orbital incl: 28.47
Max alt: 317.0 km.
Orbits: 81
Dur: 5:02:14:26
Landing: 16 November 1982 @ 0633:26 PST
Launch Info: Orbiter - Columbia 102-5 Pad 39A KSC (MLP-1) - First US crew not
to wear pressure suits; also Ejection seats disarmed.

MISSION PARTICULARS
Launch Window: 33 min., 7:19 - 7:52 am EST, on-time launch
TAL Sites: Dakar, Senegal
AOA site: DSC/SLF (due to high winds at White Sands
Primary landing site: Edwards AFB, scheduled at 0624 PST on 16 November
Landing Speed: 198 knots (227 mph)
Landing rollout: 9,553' from main gear touchdown
Vehicle weight @ liftoff: 4,487,268 lbs
Orbiter weight @ liftoff: 247,113 lbs
Orbiter weight @ landing: 202,480 lbs
PAYLOADS
Cargo mass approx.: 32,080 lbs
Landing Mass: 17,495 lbs
Special mission kits: EMU's 1025 & 1022, food warmers, teleprinter, Mission Specialist seats (2), EVA Task Station (Busy Box), no RMS
PRIMARY PAYLOADS
HS-376 SBS-C/PAM-D, 1982-110B - deployed mass 7,211 lbs. & ASE (Anik-C3 - 1,368 lbs) HS-376 Telesat E (Anik-CS/PAM-D), 1982-110C - deployed mass 7,374 lbs & ASE (Anik-C3 - 1,390 lbs)
EVA Activity: EVA planned for this flight was cancelled due to EMU malfunctins at 0650 EST, 15 November (after being delayed 1 day due to Lenoir's SMS)
SECONDARY PAYLOADS
OEX: EOIM, ISAL, TGH, CSE, DATE & ACIP
SSIP: SE81-2 (Effects of Zero Gravity on Formation of Sponges), SE81-9 (Liquid surface tension convection in zero G), SE81-5 (Formation of crystals in zero G)
GAS: G-0026 (DG-205 I X-ray Invest. of Metallurgical Effects in Zero-G)
SHUTTLE STACK COMPONENTS
SSME's: 2007 (1), 2006 (2), 2005 (3) all fifth use. At liftoff 100% and same after throttle-up
OMS Pods/Engines: LP-02/102 & RP-02/101 - all fifth use
ET: ET-05 (HWT-05)
SRB's: SRM-05 - Booster set successfully recovered
SHUTTLE STACK COMPONENTS
Left - 5A Right - 5B
G-2 001 Fwd 012 New
D-4 017 Cyl 023 D-4
Q-3 022 Cyl 024 Q-3
G-2 012 Cyl 035 G-3
Q-3 014 Cyl 082 New
Q-3 018 Cyl 085 New
Q-3 019 Cyl 086 New
G-2 003 Att 005 Q-3
Q-3 007 Stf 023 New
Q-3 008 Stf 028 New
New 013 Aft 007 Q-2
First commercial satellite launch.
MISSION MILESTONES:
2 June 1982 ET-05 arrives on dock
15 July 1982 OV-102 arrives in OPF-1 after ferry flight from Edwards AFB
19 August 1982 ET/SRB mate in VAB High Bay 3
9 September 1982 OV-102 rollover from OPF-1 to VAB High Bay 3 for mating with stack the next day
21 September 1982 Stack rollout to Pad 39A
24 September 1982 TCDT dress rehearsal conducted with crew onboard orbiter
28 September 1982 Integrated Cryogenic Loading Test (ET propellant laoding) conducted to verify ET insulation integrity
18 October 1982 Satellites loaded in payload bay at Pad 39A
7 November 1982 "Call to stations" 80 hr. countdown started at 3 am EST
9 November 1982 Astronaut arrival at Patrick AFB/KSC
11 November 1982 Launch
16 November 1982 Landing at Edwards AFB
21 November 1982 Ferry flight from Edwards AFB to Kelly AFB (overnight stay) and delivery to KSC the next day
23 November 1982 OV-102 arrives in OPF to begin modifications for upcoming STS-9 flight
pre-shuttle missions. shuttle era missions.
Table of Contents Shuttle Missions Main